Platform closures at London Bridge

As part of the Thameslink programme, Network Rail will be undertaking engineering works at London Bridge to reconnect two new platforms - 14 and 15 - prior to closing platforms 12 and 13 for rebuilding.
An aerial view of London Bridge Station on the south bank of the ThamesAn aerial view of London Bridge Station on the south bank of the Thames
An aerial view of London Bridge Station on the south bank of the Thames

The engineering works start on Friday, March 28 from 10am and only affect Southern services. First Capital Connect trains will operate as normal between London Bridge and East Croydon.

London Bridge will be closed to Southern trains on Saturday, March 29 and Sunday, March 30.

Details of the revised train services for these days can be found at: southernrailway

Related topics: